UPDATE 1-Valero to start FCC work at Three Rivers refinery
(Recasts, updates with Valero statement, details)
HOUSTON, May 16 (Reuters) - Valero Energy Corp (VLO.N: Quote, Profile, Research, Stock Buzz) said on Friday a 24,000 barrel per day (bpd) gasoline-producing fluidic catalytic cracking unit will be shut at its 100,000-bpd Three Rivers, Texas, refinery.
Valero spokesman Bill Day said the work, which Valero notified state pollution regulators would begin on Friday, was on the plant's cat cracker.
A source familiar with refinery operations said the planned repairs would be made to a standpipe on the FCC.
The work is expected to last through May 26, according to the notice filed with the Texas Commission on Environmental Quality. (Reporting by Erwin Seba; Editing by David Gregorio)
© Thomson Reuters 2008 All rights reserved
Ads by Career Builder
Energy Trader
Details: ...of the leading energy infrastructure companies...diversified portfolio of energy assets in the US and Canada. The Energy Trader is an exciting...
Energy Analyst
Details: ...comfort, safety and energy-efficiency of buildings. We also...establishes and monitors energy consumption, utility...Base Tool) to track energy consumption during...
Energy Engineer
Details: The Energy Engineer provides engineering...support to the Air Force Energy Program to address energy, water, and other utility...
Energy Measurement Tech
Details: ...in fulfilling all tasks and responsibilities as noted in the Energy Measurement Technician Line-of-Progression (LOP) document. In...








